HCA Houston Clear Lake Medical Center Roof Replaced With Wind Vented Roof System

Project Information:

Address:
500 W. Medical Center Blvd., Webster, TX 77598

Existing Assembly:
Structural concrete deck

New Roof Assembly:
Loose-laid ½” Fire-Rated Gypsum Coverboard
ERC Single-Ply Membrane, Minimum 60 Mil Thick

Project Size:
Multiple roof areas

Installation:
Completed December 2024

Project Highlights:

  • Complex high-tower staging over an active hospital environment

  • Noise- and odor-sensitive operations to minimize intrusion to patients and staff

  • Engineered for long-term durability with moisture control

Warranty:
ERC 20-Year NDL, 150 MPH Wind Rider

Previous
Previous

Data Management Systems in Malabar, FL